A 20-foot landscaped buffer between the road right-of-way line and the beginning of
either paving or building on the site shall be provided. The landscaped buffer shall
include a mixture of grass, shrubs and trees.
(Ord. No. 2007-35, § 1, 12-11-2007)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');